Robot Population Capacity

From PolyCraft World
Jump to navigation Jump to search

Description

The Robot Population Capacity is the result of a calculation that computes how many delivery bots can be working in your Distribution Plot on your Island Logistics Nexus. The more primitive warehouse can only accommodate 1 bot while the most advanced can hold up to 11 efficiently working robots. See Warehousing for a more detailed description.

Tech Level Required Construction Material Required Machinery Maximum Structure Footprint (including walls) Room configurations Allowable Height of Doors (# of blocks above the Village Plot Blocks) % of Walls that Must be Construction Material (not including corners/floor/ceiling) Population Capacity
1 Dirt Dirty Charging Station 25 sq. meters 5x5 blocks (3x3 interior) 4 blocks (~ 1 story) >= 85% 1
2 Wood Woody Charging Station 40 sq. meters 5x8 blocks (3x6 interior) or 6x6 blocks with overhang (4x4 interior with 2 block overhang) 4 blocks (~ 1 story) >= 75% 2
3 Stone(not cobblestone) Marbled Charging Station 55 sq. meters 5x11 blocks (3x9 interior) or 7x7 blocks with overhang (5x5 interior with 2-6 block overhang) 8 blocks (~ 2 stories) >= 65% 3
4 Polexiglas Plexi Charging Station 70 sq. meters 5x14 blocks (3x12 interior) or 8x8 blocks (6x6 interior) with overhang 8 blocks (~ 2 stories) >= 55% 4
5 ABS Bricks Plastic Charging Station 85 sq. meters 5x17 blocks (3x15 interior) and others 12 blocks (~ 3 stories) >= 50% 5
6 Bronze Bronze Charging Station 100 sq. meters 5x20 blocks or 10x10 blocks 16 blocks (~ 4 stories) >= 45% 7
7 Stainless Steel Stainless Steel Charging Station 115 sq. meters 5x23 blocks or 10x11 blocks 20 blocks (~ 5 stories) >= 40% 9
8 Carbon Fiber Resin Carbon Fiber Epoxy Charging Station 130 sq. meters 5x26 blocks or 11x11 blocks 24 blocks (~ 6 stories) >= 35% 11

Useful Internal Links

Polycraft World Main Page | 3D Printing Challenge | Refugee Crisis Challenge Home | Global Logistics Challenge | Island Logistics Nexus | Distribution Complex | Distribution Plot | Robots | Warehousing | Utility Buildings | Efficiency | Robot Population Capacity | 3D Printer | 3D Scanner | Phase I Scoring | Phase II Scoring | Score Through the Aegis | Charging Stations | Technology Level (GLC)