Robot Population Capacity
Jump to navigation
Jump to search
Description
The Robot Population Capacity is the result of a calculation that computes how many delivery bots can be working in your Distribution Plot on your Island Logistics Nexus. The more primitive warehouse can only accommodate 1 bot while the most advanced can hold up to 11 efficiently working robots. See Warehousing for a more detailed description.
Tech Level | Required Construction Material | Required Machinery | Maximum Structure Footprint (including walls) | Room configurations | Allowable Height of Doors (# of blocks above the Village Plot Blocks) | % of Walls that Must be Construction Material (not including corners/floor/ceiling) | Population Capacity |
---|---|---|---|---|---|---|---|
1 | Dirt | Dirty Charging Station | 25 sq. meters | 5x5 blocks (3x3 interior) | 4 blocks (~ 1 story) | >= 85% | 1 |
2 | Wood | Woody Charging Station | 40 sq. meters | 5x8 blocks (3x6 interior) or 6x6 blocks with overhang (4x4 interior with 2 block overhang) | 4 blocks (~ 1 story) | >= 75% | 2 |
3 | Stone(not cobblestone) | Marbled Charging Station | 55 sq. meters | 5x11 blocks (3x9 interior) or 7x7 blocks with overhang (5x5 interior with 2-6 block overhang) | 8 blocks (~ 2 stories) | >= 65% | 3 |
4 | Polexiglas | Plexi Charging Station | 70 sq. meters | 5x14 blocks (3x12 interior) or 8x8 blocks (6x6 interior) with overhang | 8 blocks (~ 2 stories) | >= 55% | 4 |
5 | ABS Bricks | Plastic Charging Station | 85 sq. meters | 5x17 blocks (3x15 interior) and others | 12 blocks (~ 3 stories) | >= 50% | 5 |
6 | Bronze | Bronze Charging Station | 100 sq. meters | 5x20 blocks or 10x10 blocks | 16 blocks (~ 4 stories) | >= 45% | 7 |
7 | Stainless Steel | Stainless Steel Charging Station | 115 sq. meters | 5x23 blocks or 10x11 blocks | 20 blocks (~ 5 stories) | >= 40% | 9 |
8 | Carbon Fiber Resin | Carbon Fiber Epoxy Charging Station | 130 sq. meters | 5x26 blocks or 11x11 blocks | 24 blocks (~ 6 stories) | >= 35% | 11 |
Useful Internal Links
Polycraft World Main Page | 3D Printing Challenge | Refugee Crisis Challenge Home | Global Logistics Challenge | Island Logistics Nexus | Distribution Complex | Distribution Plot | Robots | Warehousing | Utility Buildings | Efficiency | Robot Population Capacity | 3D Printer | 3D Scanner | Phase I Scoring | Phase II Scoring | Score Through the Aegis | Charging Stations | Technology Level (GLC)